Trenchless installation of a gas-pipelineConnection of several towns to the gas supply
Pipesystem:
Material: PE 80 yellow - MRS 8 acc. to ISO 9080
Dimension: da 160 x 14,6 mm
Operating pressure: up to 4 bar
Connection technique: Heating element butt welding
Length of pipeline: 9.029 m
Length of piperope: up to 120 m
Quality Assurance: Continuous ultrasonic wall thickness measurement and quality controls during the whole production process by a certified production according to ISO 9001.
Installation: Steerable drilling system with a minimum installation depth of 1,0 m.
Pipesystem:
Material: PE 80 yellow - MRS 8 acc. to ISO 9080
Dimension: da 160 x 14,6 mm
Operating pressure: up to 4 bar
Connection technique: Heating element butt welding
Length of pipeline: 9.029 m
Length of piperope: up to 120 m
Quality Assurance: Continuous ultrasonic wall thickness measurement and quality controls during the whole production process by a certified production according to ISO 9001.
Installation: Steerable drilling system with a minimum installation depth of 1,0 m.
Agruline Piping Systems